Nowadays, the labor cost in many cities continues to soar. The handling cost of traditional sand and cement paving is very high. The cost of bricklaying is a big expense. In the process of laying bricks, it is necessary to wait for the ground to be leveled before paving. The period is relatively long. The use of support reduces the labor cost of the owners.
In many cities or new communities, sand and cement are not allowed to be transported by elevators. The support overhead system is used to effectively solve this problem
If the ground needs heating, a large amount of cement is wrapped around the geothermal pipe, so the heat loss is very large. The temperature transmitted to the ground is the residual temperature of the geothermal pipe, and the support system can effectively slow down the heat loss
In case of geothermal pipe or cable failure, it's a big project to open the tile for maintenance. If it's not good, the whole ground may need to be resurfaced. There is no place for a large amount of construction waste generated by secondary decoration or flip loading.
The indoor support can be used to repair the circuit fault by removing the floor, which is convenient and practical.
Mobile/WhatsApp:+ 86 176 8231 3725
ADD:Room B205, Cross-Border E-Commerce Comprehensive Pilot Area, No. 776 Jianshe 1st Road, Xiaoshan District, Hangzhou Zhejiang, China
Copyright: Hangzhou Moonbay Industrial Co., Ltd. @ 2021 record Technical support: xuanmeng network